<?xml version="1.0" encoding="UTF-8"?><!-- generator="WordPress/2.5" -->
<rss version="0.92">
<channel>
	<title>The Lakes of Muirfield</title>
	<link>http://thelakesofmuirfield.com</link>
	<description>The Lakes of Muirfield</description>
	<lastBuildDate>Mon, 22 Sep 2008 04:58:16 +0000</lastBuildDate>
	<docs>http://backend.userland.com/rss092</docs>
	<language>en</language>
	
	<item>
		<title>New pictures, new links!</title>
		<description><![CDATA[We have added a link to each of the builders at the bottom right corner of each page to make it convenient to visit their websites to find out more about their home designs for The Lakes of Muirfield.
Speaking of homes at The Lakes of Muirfield - be sure to check out the new photos [...]]]></description>
		<link>http://thelakesofmuirfield.com/archives/31</link>
			</item>
	<item>
		<title>Spring has sprung and foundations are forming!</title>
		<description><![CDATA[It&#8217;s a very exciting time at Muirfield!  We have foundations going into the ground for showhomes as well as some spec homes up Muirfield Boulevard!  When the roads get paved (keep checking for the paving updates), we are really going to start to have a view to what Muirfield is going to be [...]]]></description>
		<link>http://thelakesofmuirfield.com/archives/28</link>
			</item>
	<item>
		<title>Flatiron to design and build new Calgary Ring Road</title>
		<description><![CDATA[The Alberta government chose Bilfinger Berger BOT to develop the project, and Bilfinger has selected Stoney Trail Constructors, a joint venture led by Flatiron Constructors with Parsons and Graham Construction and Engineering, to design and build a new 21-kilometer (13-mile) portion of the ring road. Flatiron’s share amounts to 61% (EUR160million).]]></description>
		<link>http://thelakesofmuirfield.com/archives/8</link>
			</item>
</channel>
</rss>
